Queues:7 wastes
Simplify:5 s
variability:an deviation from the optimum process that delivers perfect product on time and every time
throughput:the time required to move orders through the production process
MCT:Manufacturing Cycle time
BOM:BiIll of materials
Static:types of Bill of Materials
Dynamics:A bill of materials for a product apart of w/c size, color,laminate and other options can be selected
JIT:Toyota
PPC:Production Planning and Control
Production:Process that utilize bill of materials
BillofMaterials:a listing of all raw materials, parts, sub assemblies and assemblies needed to produce one unit of a product
pullsystem:a concept that result in material being produced only when requested and moved to where it is decided just at it is needed
Quality:one of the concerns of supplies in JIT
Motion:another 7 wastes
Kaizen:a focus on continuous improvement
PST:product structure tree
Kanban:Japanese word for card
Schedules:One of JIT Scheduling: Make Level __________
Inventory:Consignment____________
Production Planning and Control
Across:| 2. | a listing of all raw materials, parts, sub assemblies and assemblies needed to produce one unit of a product | | 4. | A bill of materials for a product apart of w/c size, color,laminate and other options can be selected | | 8. | a concept that result in material being produced only when requested and moved to where it is decided just at it is needed | | 13. | the time required to move orders through the production process |
| | 15. | product structure tree | | 16. | a focus on continuous improvement | | 18. | an deviation from the optimum process that delivers perfect product on time and every time |
| | Down:| 1. | BiIll of materials | | 3. | Consignment____________ | | 5. | 5 s | | 6. | another 7 wastes | | 7. | types of Bill of Materials | | 9. | Manufacturing Cycle time |
| | 10. | One of JIT Scheduling: Make Level __________ | | 11. | Process that utilize bill of materials | | 12. | one of the concerns of supplies in JIT | | 14. | Production Planning and Control | | 16. | Japanese word for card | | 17. | Toyota |
| |
© 2014
PuzzleFast.com, Noncommercial Use Only
Production Planning and Control
Across:| 2. | a listing of all raw materials, parts, sub assemblies and assemblies needed to produce one unit of a product | | 4. | A bill of materials for a product apart of w/c size, color,laminate and other options can be selected | | 8. | a concept that result in material being produced only when requested and moved to where it is decided just at it is needed | | 13. | the time required to move orders through the production process |
| | 15. | product structure tree | | 16. | a focus on continuous improvement | | 18. | an deviation from the optimum process that delivers perfect product on time and every time |
| | Down:| 1. | BiIll of materials | | 3. | Consignment____________ | | 5. | 5 s | | 6. | another 7 wastes | | 7. | types of Bill of Materials | | 9. | Manufacturing Cycle time |
| | 10. | One of JIT Scheduling: Make Level __________ | | 11. | Process that utilize bill of materials | | 12. | one of the concerns of supplies in JIT | | 14. | Production Planning and Control | | 16. | Japanese word for card | | 17. | Toyota |
| |