1:00
en
CR
Renovations
12
Bearer: what supports the floor joists
Plasterboard: what is the internal wall lining called
Fibre cement: this is used to line the eaves
Measured: the existing home needs to be_ to accurately document the renovations
Engineering: brick can be used for upper floor renovations but additional _ will be required
Six star rated: energy efficiency, renovations are required to be _ as per new homes
Lightweight: upper renovations are generally _ to minimise the impact on the existing home
Structure: it is necessary to know the materials of the existing _ to document accurately
Compressed sheeting: flooring in wet areas
Masterwall: the external cladding we are documenting
190x45mgp10: the floor joists size and stress grade we are documenting
600mm: the standard clearance between existing ceiling and new floor level
Renovations
Across:2. | brick can be used for upper floor renovations but additional _ will be required | 5. | the standard clearance between existing ceiling and new floor level | 9. | the existing home needs to be_ to accurately document the renovations | 10. | it is necessary to know the materials of the existing _ to document accurately | 11. | what is the internal wall lining called | 12. | the floor joists size and stress grade we are documenting |
| | Down:1. | upper renovations are generally _ to minimise the impact on the existing home | 3. | flooring in wet areas | 4. | what supports the floor joists | 6. | the external cladding we are documenting | 7. | energy efficiency, renovations are required to be _ as per new homes | 8. | this is used to line the eaves |
| |
© 2016
PuzzleFast.com, Noncommercial Use Only
Renovations
Across:2. | brick can be used for upper floor renovations but additional _ will be required | 5. | the standard clearance between existing ceiling and new floor level | 9. | the existing home needs to be_ to accurately document the renovations | 10. | it is necessary to know the materials of the existing _ to document accurately | 11. | what is the internal wall lining called | 12. | the floor joists size and stress grade we are documenting |
| | Down:1. | upper renovations are generally _ to minimise the impact on the existing home | 3. | flooring in wet areas | 4. | what supports the floor joists | 6. | the external cladding we are documenting | 7. | energy efficiency, renovations are required to be _ as per new homes | 8. | this is used to line the eaves |
| |
© 2016
PuzzleFast.com, Noncommercial Use Only